S.No Client Name of the work Cost of Project:(in Lakhs.)
1 Adani Green Energy (UP) Ltd. Ahmedabad, Gujarat Supply and service order for 66KV Trasmission Line & OPGW work for 20 MW T Narasipura Solar Project, Dist. Mysore, Karnataka. 47
2 Adani Green Energy (UP) Ltd. Ahmedabad, Gujarat Service Oder for Revertment of Trasmission Line Tower for 20 MW, T Narasipura Solar Project Dist. Mysore, Karnataka. 46
3 Adani Green Energy (UP) Ltd. Ahmedabad, Gujarat Service Oder for Revertment of Trasmission Line Tower for 20 MW, T Narasipura Solar Project Dist. Mysore, Karnataka. 81
4 Adani Green Energy (UP) Ltd. Ahmedabad, Gujarat Service Order for the deputation of OPGW Stringing Gang for 20 MW Malur Solar Project, District Kolar, Karnataka 16
5 Adani Green Energy (UP) Ltd. Ahmedabad, Gujarat Purchase and Service Order for the Design, Engineering, Manufacture, assembly, inspection and testingat works, supply apcking forwarding trasportation with trasit insuranceon F.O.R site basis, for 11 KV Over head Trasmission Line for 20 MW, Ramanagara Solar Project, Karnataka 32
6 Adani Green Energy (UP) Ltd. Ahmedabad, Gujarat Service Order for reciept, unloading and handling at site storage, Erection, Testing & Commissioning(ETC) of FO Cables for 20 MW Channapattana Solar Project, Karnataka. 7
7 Banashankari Electricals, Davangere, Karnataka Shifting of 110kV Munirabad-Sindhanoor DC Line near Huligemma Devastana (chainage 138+400) between location Nos 14 & 15 - in connection with railway doubling work of "Hospet-Hubbali-Londa-Tinaighat” under Deposit Contribution Work" as per the request of M/s. RVNL including supply of equipment/ Materials, Erection (including Civil works), testing and commissioning on total turnkey basis" 112
8 Adani Green Energy (MP) Ltd. Ahmedabad, Gujarat Supply and Service order for Receipt, unloading at site, site storage, hanling at site,erection, testing and commissiong(ETC) of all the materials and equipments for 220KV Trasnmission Lineat Dayapar Wind SS to Intermidiate Pointfor 600 MW Dapar Wind Power Project, Kutch, Gujarat. 96
9 Adani Green Energy (MP) Ltd. Ahmedabad, Gujarat Supply and service order for design engineering,manufaturing,assebmly,inspection and testing at work ,packing and forwarding/dispatch,transportaion with transit insurance charges on F.O.R site basis for supply of 33KV Galvanised RSJ pole Line 79
10 Sterlite Power Transmission Limited, New Delhi Work Order for 220/110kV MCMV Tower Foundation Works in K2 Project of Kerala State Electricity Board Limited (KSEB), being executed by Sterlite Power Transmission Limited (SPTL) 64
11 Banashankari Electricals, Davangere, Karnataka Providing intermediate towers to existing 220KV RTPS – Lingsugur I & II and 220RTPS – Lingsugur III line for proposed Construction works of Nayayanapur Canal near Vadavatti Village in Manvi. Tq. Raichur Dist. Under Self Execution Scheme by KBJNL 110.00
12 Banashankari Electricals, Davangere, Karnataka Replacement of existing 90KN Disc insulators by new 110kV Polymer Insulators (Silicon composite rubber insulator strings) for Lynx Conductor with 16mm ball and socket on the existing 110kV Sevanur LILO DC line between location No 1 to 29 in TLM section Haveri of TL&SS Division Haveri 17
13 Banashankari Electricals, Davangere, Karnataka Service Order for Providing Two No’s of 220/110KV MC intermediate tower type ‘MB+6’ in the existing 110KV Honnavar-Murdeshwara SC line for improving Road clearance of the line to Honnavar-Murdeshwara NH -66(Formerly NH-17) crossing between Tower location No: 91 to 93 in Murdeshwara Taluka & Uttara kannada District under self execution works by NHAI Mangalore- 11
14 Banashankari Electricals, Davangere, Karnataka Service Order for Providing Two No’s of 220/110KV Multi circuit intermediate tower type ‘MD+9’ & One No of 220/110KV MC Intermediate tower Type ‘MB+0’ in the existing 110KV Kumata-Ankola SC line for improving Road clearance of the line Karwara-Kumata NH -66(Formerly NH-17) crossing between Tower location No: 11 & 12 in Kumata Taluka& Uttara kannada District under self execution works by NHAI Mangalore 30
15 Banashankari Electricals, Davangere, Karnataka Service Order for Providing One No’s of 110KV DC intermediate tower type ‘DC+3’ & One No of 220KV DC Intermediate tower Type ‘DB+12’ in the existing 110KV Sirsi-KumataDC line for improving Road clearance of the line Karwara-Kumata NH -66(Formerly NH-17) crossing between Tower location No: 151 & 153 in Kumata Taluka& Uttara kannada District under self execution works by NHAI Mangalore- 8
16 Narmada Electricals Bhopal(M.P) Shifting the HT Towers/Poles and Lines, increasing the Vertical & Horzontal clearence of existing 33KV Kathal feeder line at location bearing T.No( ) & P.No ( ) in the or Close to the future extension part of the NH-66 Chainage KM +, Ankola, Under “Self Execution Basis 108
17 Narmada Electricals Bhopal(M.P) Erection of 220KV Narrow Based DC towers-Proposed L&T design NRS-Laggere of NBT DB/DE+6mtr(2 no's) NBT DB/DE+0 (2 no's), NBT DB/BE+3Mtr ext(1No's) Proposed L&T design NRS-Laggere intermate towers in 220KV B3-B4 DC line at location bearing T.N.662+672 for maintaining the vertical and horizontal clearance of proposed National Highway road near Kodihally limits in TLM Section, Arasikere, TLM Sub-Division, Hassan (KM 99+225) under Self-Execution basis by M/s NHAI. 251
18 Kanataka Power Transmission Corporation Limited "1) Erection of one No. 220 KV D/C “DB+3Mtr” Extn. type intermediate tower of Kalpataru Design for increasing ground clearance between location number 610-611 of 220kV B3-B4 line near Banavara limits in TLM Section, Arasikere, TLM Sub-Division, Hassan. 2) erection of one No. of 110 KV class D/C “DB+3 Mtr” type intermediate towers of Kalpataru Design in 110 KV (SBT-2) transmission line of Tower Number between location 387-389 near Ramasagara limits in TLM Section, Arasikere, TLM Sub-Division, Hassan" 32.86
19 Krishna Bhgya Jal Nigam Limited Providing Intermediate tower to the existing 110KV Raichur-Shahpur Line-1&2, between loc no 550A & 551A, for construction of Trough Aqueduct of KBJNL, NRBC distributor 23 under Supervision of KPTCL & KBJNL on Turnkey basis 46.75
20 Kanataka Power Transmission Corporation Limited Providing Additional 1x12.5MVA, 66/11KV Power Transformer at 66/11KV Santhekadur Sub Station in Shivamogga Taluk & district on Partial Turnkey Basis 77.77
21 Kanataka Power Transmission Corporation Limited Providing Additional 1X 8 MVA, 66/11KV Power Transformer at Seegebagi Sub-station in bhadravathi Taluk, Shivamogga District 86.65
22 Kanataka Power Transmission Corporation Limited Shifting/Heightening of existing 220kV Shivamogga- Antharasanahalli, Shivamogga - K B Cross DC line passing through the Govt Primary school premises at Srirampura Village in between Loc.No. 208 to Loc.No.218 in Birur TLM section, Kadur TLM subdivision, Chikkamagaluru TL&SS Division, Shivamogga Tr(W&M) Circle” on Total Turnkey Basis 289
23 Kanataka Power Transmission Corporation Limited Shifting/Heightening of existing 220kV Kadur - Dabaspete & Shivamogga - Arasikere DC line passing through the Government Tool Room & Training Center, Kadur in between Loc.No.213 to Loc.No.214 in Birur TLM section & TLMSD Kadur in Chikkamangaluru District and the works executed under Executive Engineer, TL & SS Division, KPTCL, Chikkamagaluru, ShivamoggaTr(W&M) Circle on Total Turnkey Basis. 194
24 Kanataka Power Transmission Corporation Limited Shifting/Heightening of existing 220kV Shivamogga - Antharasanahalli & Shivamogga - K B Cross DC line passing through the Govt.High School Premises at Kuppal Village in between Loc.No.249 to Loc.No.250 in Birur TLM section & TLMSD Kadur in Chikkamangaluru District the works executed under Executive Engineer, TL & SS Division, KPTCL, Chikkamagaluru, Shivamogga Tr(W&M) Circle on Total Turnkey Basis. 249
All AWARDED PROJECT COST 2091.03

Completed Project

Turn Over :- Our Turn Over For the Last Financial Year 2018-2019 is 2.80 Corers in Indian Rupees